4.7.10

Phase One Deer Lake

My brother Aare (poor guy, thankfully almost always available when I need a 'guy') came out two days in a row to help me get Phase One of the Deer Lake Airport Installation set up.
It took us two days to find all the studs and bolt on a few pieces of aluminum tubing, which will act as the support for the remainder of the installation. On the fist day, only one person was allowed in the lift-- so Aare being a man, was the one to work with the airport's personnel... the second day, we were both allowed on the lift, as long as airport personnel were controlling the lift... safety first!

No comments: